Viridor IVC Welfare Infrastructure
Client :
Nature of the works :
Scope and service provided :
Duration :
AE Yates / Viridor
IVC welfare facility infrastructure works at four Viridor sites across Greater Manchester
STEM Construction was commissioned to complete:
- Excavation and disposal of materials
- Import and compaction of foundation stone
- Construction of mesh reinforced concrete foundation slab / plinths to accommodate the installation of the new IVC welfare units
- New foul drainage connections to the existing on-site systems
- Installation of surface water drainage
- Service ducting and potable water connections
- Installation of timber edged footpaths
8 week construction period