Viridor IVC Welfare Infrastructure

Client :

 

Nature of the works :

 

Scope and service provided :

 

 

 

 

 

 

Duration :

AE Yates / Viridor

 

IVC welfare facility infrastructure works at four Viridor sites across Greater Manchester

 

STEM Construction was commissioned to complete:

  • Excavation and disposal of materials
  • Import and compaction of foundation stone
  • Construction of mesh reinforced concrete foundation slab / plinths to accommodate the installation of the new IVC welfare units
  • New foul drainage connections to the existing on-site systems
  • Installation of surface water drainage
  • Service ducting and potable water connections
  • Installation of timber edged footpaths

8 week construction period

Contact STEM Construction with any enquiries – 0161 7111 255