Tetrosyl – Add Blue Secondary Containment Bund

Client :

 

Nature of the works :

 

 

Scope and service provided :

 

 

 

 

Duration :

Tetrosyl Ltd

 

Design and build contract to construct a secondary containment concrete bund to house four new stainless steel liquid tanks.

Procurement and coordination of the design phase of the structure ensuring compliance with the COMAH regulations.

Construction of a reinforced concrete bund.

Reinforcement of the existing retaining wall above which the concrete bund was constructed.

Due to unknown ground conditions beneath the existing ground slab, the bund was designed so to spread the loading of the tanks.

 

3 week construction period